Concrete Leveling - After Concrete Leveling



After Concrete Leveling
Next Photo
We have drilled a dime sized hole into the slab and then filled it with our Polyurethane foam. It was then leveled and the hole was sealed with caulk. Once it dried, our customer was able to walk on it in 15 minutes.

our service area

We serve the following areas

Our Locations:

BQ Basement Systems
525 Bethlehem Pike
Erdenheim, PA 19038
1-215-987-6515